What We Do

Services

Every service we offer, broken down by what it actually involves.

Home › Services

Everything we take on

Every job below is one we do ourselves across Mount Prospect.

Deck Installation

We frame new decks with joists spaced to the span table for the decking you've picked, not a generic 16 inches on center regardless of load. Footings go below the 42-inch frost line that's standard for this part of Illinois, so the deck doesn't heave when the ground freezes.

Deck Repair

Soft spots, bouncy stairs and rot at the post bases usually trace back to one bad connection, often the ledger board or a joist hanger that's rusted through. We open up the area, replace the framing underneath instead of covering it, and match the decking so the repair doesn't stick out.

Deck Staining & Sealing

Pressure-treated and cedar decks need a fresh coat of sealer every one to three years depending on sun exposure, or the wood grays and starts to check. We pressure wash first, let the boards dry fully, then apply a semi-transparent or solid stain depending on how much grain you want showing.

Custom Deck Design

Multi-level decks, built-in bench seating, pergola attachments, we plan the layout and stair runs before any lumber gets cut. We'll tell you up front if a design idea is going to fight the slope of your yard or the height of your back door.

Composite Decking

Composite boards don't splinter and skip the yearly staining, but they still need joist spacing matched to the brand, usually 12 or 16 inches on center. We install hidden fasteners so you don't see a screw head in every board.

Deck Demolition & Removal

Old decks get torn out board by board, with the lumber hauled off instead of left in a pile at the curb. We check what's salvageable in the framing before committing to a full rebuild, since sometimes the posts and footings are still solid.

Deck Railing Installation

Railings get built to code height with balusters spaced so a 4-inch sphere can't pass through, which is what most local inspectors check first. Loose or wobbly railings usually mean the posts were screwed on instead of bolted through the rim joist.

Deck Resurfacing

If the frame underneath is still sound, we'll strip off old, cupped decking and lay new boards without rebuilding the structure. It's a faster, cheaper way to get a deck looking new when the problem is really just the surface.

Screened-In Porch Building

For homeowners who want the deck covered and bug-free, we frame a roof structure and screen panels onto the existing or new deck footprint. It takes more engineering than an open deck, mainly around roof load and header sizing.

Pergolas & Shade Structures

A pergola adds shade and definition to a deck without closing it in completely. We set the posts into their own footings rather than lagging them to the decking, so the structure doesn't rely on the deck frame to hold it up.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Mount Prospect, IL

Deck crews cover Mount Prospect and roughly fifty miles out.

Mount Prospect, IL
Chicago, IL
Naperville, IL
Elgin, IL
Evanston, IL
Arlington Heights, IL
Schaumburg, IL
Palatine, IL
Des Plaines, IL
Wheaton, IL
Hoffman Estates, IL
Common Questions

Things worth asking

Questions that come up once a project actually gets scheduled.

Do I need a permit to build a deck in Illinois?
Most municipalities in the Chicago suburbs require a permit for any deck attached to the house or built more than 30 inches above grade, Mount Prospect included. Permit requirements and setback rules vary by town, so checking local code before construction avoids a stop-work order mid-project.
How long does it take to build a typical deck?
A standard single-level deck, roughly 300 to 400 square feet, usually takes one to two weeks from footing excavation to final decking, weather permitting. Multi-level designs, screened porches, or composite decking with hidden fasteners can add several more days.
Can a deck be built to fit a specific budget?
Deck size, decking material, and railing style can all be adjusted to hit a target budget, with pressure-treated lumber costing less than composite or PVC decking per square foot. A contractor should lay out where the money goes, since cutting corners on footings or framing to save money creates problems later.
Do you offer any guarantee on deck work?
Workmanship on deck framing, decking, and railings is typically guaranteed for a set period after completion, separate from manufacturer warranties on composite decking or hardware. Manufacturer warranties on materials like Trex or TimberTech are handled directly through the product's warranty registration.
Who handles day-to-day questions during the project?
A single point of contact, usually the lead carpenter or project estimator, handles day-to-day questions during a deck build rather than a rotating cast of subcontractors. That consistency matters most when a design change or material substitution comes up mid-project.
What decking material options are available?
Options include pressure-treated pine, cedar, composite decking like Trex or TimberTech, and PVC decking, each with different upkeep and lifespans. Pressure-treated pine costs least upfront but requires restaining every one to three years, while composite and PVC cost more but require little upkeep.
Can I still use my yard and house while the deck is being built?
Normal access to the house continues during deck construction, though the immediate work area gets fenced off or blocked for safety while footings are dug and lumber is cut. Noise from saws and nail guns is normal during active construction hours.
How should the yard be prepared before deck construction starts?
Clearing furniture, grills, and potted plants from the existing deck or patio area lets the crew access footings and framing without working around obstacles. Marking any known underground sprinkler lines or buried cable ahead of time also helps avoid damage during excavation.
What happens if rot or damage turns up once old decking comes off?
Hidden rot in ledger boards, joists, or posts is common once old decking is pulled up, especially on decks over ten years old. Any additional framing repair required gets flagged with a cost estimate before replacement proceeds, rather than being a surprise on the final invoice.
How should a finished deck be maintained?
Wood decking requires a fresh coat of sealer every one to three years and an annual check for loose fasteners or soft boards, especially near ground contact points. Composite decking requires periodic washing to prevent mildew buildup in the board grooves but no staining or sealing.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (847) 307-7814